There are 50 A shares and 1200 B shares in the company. 1 share = 2.5 GPM when the wateris available. Flow in the Beaver River has to reach 54 cfs in order for water to beavailable to the A shares; flow has to reach 80 cfs in order for water to be availableto the B shares. Water Rights 77-195, 77-184, 77-144 and 77-185 are limited to 491.17 acres ofirrigation per the Proposed Determination of Water Rights, Beaver River Division. WaterRights 77-183 and 77-197 do not have a clear sole supply acreage defined in theDivision`s records. Period of use for all company rights is 4/1 to 10/31. Updated by ADoyle on 4/4/24.